الصفحة الرئيسية > أخبار الشركة

جهة الاتصال

  • Room 11608, Unit 1, Building C, Door of Metropolis, Tangyan South Road, New Area of High-tech District, Xi'an City, Shaanxi Province, China

  • +86-29-89305761

  • +86-29-89305769

  • brightway@brightwaysolids.com

الحالات

أخبار الشركة

2000HP Drilling Rig Mud Solids Control System on the Malaysian Oilfield

2020-06-09

Recently, Brightway's 2000HP drilling rig mud solids control system has completed various installation and commissioning work at an oilfield site in Malaysia.

 

2000HP Drilling Rig Mud Solids Control System

 

Because Malaysia is located in the tropics and has high temperatures all year round, oilfield drilling projects have relatively high requirements for high temperature resistance of equipment. The 2000HP drilling rig mud solids control system was designed and produced in accordance with the standards of Saudi Aramco in the Middle East. This drilling rig mud solids control system is composed of mud shaker, mud cleaner, vacuum degasser, high speed centrifuge, liquid and gas separator, mud agitator, sand pump, water tank, oil tank and electric control system,which all meet the requirements of oil-based drilling technology under high temperature environment. In particular, this system is equipped with awnings and lighting facilities to prevent heatstroke and facilitate workers' drilling operations at night.


Drilling Rig Mud Solids Control System on the Malaysian Oilfield

This Malaysia 2000HP drilling rig mud solids control system is another major cooperation between Brightway and Saudi Aramco. After years of research and many large-scale complete solid control systems exported overseas,  Brightway could independently implement international large oilfield drilling solid control projects. Meanwhile, the highly customized and rigorous inspection of mechanical equipment,as well as the timely and efficient after-sales service have won the trust of customers.

السابقة :Drilling Cutting Waste Management System Promotes Environmental Protection in Huabei Oilfield

القادم :250bbl Water Based Mud Plant for Drilling Rig

نموذج الملاحظات

* الاسم:
* البريد الإلكتروني:
* الشركة:
* فاكس:
* رقم الهاتف:
* رسالة: